Other Projects

Wind Energy - Power Generation Year Wise
 
Year State Site Location Install Capacity (MW) Generation At Controller (KWH) % Machine Availability % Grid Availability
FY (08-09) Maharashtra Khori-Titane K102 1.25 1841131 96.57 98.41
FY (09-10) Maharashtra Khori-Titane K102 1.25 2109158 98.47 98.90
FY (10-11) Maharashtra Khori-Titane K102 1.25 1574970 95.28 97.55
FY (11-12) Maharashtra Khori-Titane K102 1.25 1866496 95.68 93.34
FY (12-13) Maharashtra Khori-Titane K102 1.25 1844868 89.71 99.49
FY (13-14) Maharashtra Khori-Titane K102 1.25 1957014 95.82 97.04
FY (14-15) Maharashtra Khori-Titane K102 1.25 1552756 76.02 76.99
FY (15-16) Maharashtra Khori-Titane K102 1.25 890984 86.97 86.76
        Total 137637377 91.82 93.56
               
With a view to diversify we have made substantile investment for generation of power through alternate sources, which is our small and ecofriendly contribution to the power grid.